Pennsylvania Commercial Construction Law Attorney

Free Consultation
Hoegen Law

Reviewed by Francis J. Hoegen, Esq. — Managing Partner, Hoegen & Associates, P.C. Representing owners, developers, contractors, subcontractors and suppliers on commercial construction projects throughout Pennsylvania. — Last reviewed: September 2026.

Commercial construction disputes are won or lost on two things: what the contract says, and whether a deadline was met. Pennsylvania sets hard, unforgiving deadlines — six months to file a mechanics’ lien claim, thirty days’ advance notice before a subcontractor may file one, fourteen days to give written notice of a good faith reason for withholding payment. Miss one and the claim is gone regardless of its merit.

Hoegen & Associates, P.C. works the full arc of a commercial project: qualifying and bidding the work, putting the bonding and licensing in place, negotiating permit and connection fees, drafting the contracts and subcontracts that allocate risk before anyone breaks ground, and prosecuting or defending the liens, bond claims and disputes when a project goes wrong.

Quick Answer — The Deadlines That Decide Pennsylvania Construction Claims

•        Mechanics’ lien claim: Six months after completion of the claimant’s work. 49 P.S. § 1502(a)(1).

•        Subcontractor’s advance notice: Formal written notice of intention to file, served on the owner at least 30 days before the claim is filed. 49 P.S. § 1501(b.1). A contractor in privity with the owner is exempt.

•        Service of the filed claim: On the owner within one month after filing, with an affidavit of service filed within 20 days after service. 49 P.S. § 1502(a)(2).

•        Enforcing the lien: A complaint to enforce must be filed within two years of the lien filing. Filing preserves the claim; it does not collect on it.

•        Payment to a contractor: If the contract is silent, 20 days after the end of the billing period or delivery of the invoice, whichever is later. 73 P.S. §§ 501–516.

•        Payment to a subcontractor: 14 days after the contractor receives payment or the subcontractor’s invoice, whichever is later.

•        Withholding payment: Written notice of the good faith reason, within the contract period or 14 days of notice of the deficiency item. 73 P.S. § 511(b)(1). No notice means the defenses are waived.

•        Public payment bond notice: A claimant not in direct contract with the prime must notify the prime within 90 days of last furnishing. 8 P.S. §§ 191–202.

•        Suit on a public payment bond: Not before 90 days after last furnishing, and not later than one year after it.

Scope of This Practice

•        Commercial and industrial projects only — warehouse and distribution, data centers, energy and power facilities, healthcare, retail, hospitality, office and multi-unit residential development.

•        Every position on the project — owners and developers, general contractors, subcontractors, suppliers and design professionals.

•        Front end and back end — contract and subcontract drafting and negotiation before the work starts; claims, liens, arbitration and litigation when it does not go to plan.

•        Private and public work — privately owned commercial projects, and publicly owned and publicly funded work, which runs on an entirely different set of rules for bidding, bonding and payment.

•        Not covered here — residential home improvement work for individual homeowners, which is governed by a separate statutory regime and is outside this practice.

How should a commercial construction contract be drafted and negotiated?

A construction contract’s job is to say who bears each risk when something does not go according to plan — because on a project of any size, something will not. Most disputes we are asked to litigate were decided years earlier, in clauses nobody negotiated. Standard industry forms are a reasonable starting point, but they are drafted from a point of view, and the party who accepts one unmodified has usually accepted someone else’s risk allocation.

The provisions that determine outcomes are these:

Provision What is actually at stake
Scope and the order of precedence Which document controls when the drawings, specifications and contract conflict. Ambiguity here produces change order disputes for the life of the project.
Payment and conditions precedent Whether payment to a subcontractor is genuinely conditioned on the owner paying the general contractor, or merely timed to it. The difference determines who absorbs an owner’s insolvency, and it turns on precise drafting.
Change orders and directed changes Whether work can be directed before price and time are agreed, and what the contractor must do to preserve a claim if it is.
Notice provisions Most claim provisions are conditions precedent. A meritorious delay or extra-work claim is routinely lost because written notice was not given in the form and time the contract required.
Delay and schedule Whether delay damages are recoverable at all, whether concurrent delay is addressed, and whether float belongs to the project or to a party.
Differing site conditions Who carries the risk of subsurface conditions that differ from what the documents showed — frequently the largest single exposure on a site-intensive project.
Liquidated damages The daily rate, whether it is the exclusive remedy for delay, and whether it is capped.
Retainage The percentage, when it reduces, and when it must be released. Pennsylvania restricts how long retainage may be withheld after final acceptance.
Indemnity and insurance The scope of the indemnity, additional insured status, waiver of subrogation, and whether the required coverage actually responds to the indemnity obligation.
Termination Termination for cause versus for convenience, the cure rights that precede it, and what a wrongful termination costs.
Dispute resolution Mediation, arbitration or litigation; the forum; whether related disputes can be consolidated; and whether attorney fees are recoverable.

We draft and negotiate these agreements from either side of the table, and we do it with the dispute in mind — because the clause that reads well in a conference room is the clause that will be construed against you at hearing.

What should a commercial subcontract contain?

A subcontract is not a shorter version of the prime contract. It is a separate agreement that has to sit consistently underneath one, and the gaps between the two are where subcontractors lose money. The recurring problems are specific and avoidable:

  • Flow-down by incorporation. The subcontract incorporates the prime contract by reference, binding the subcontractor to obligations it has never read. Every subcontract negotiation should begin by obtaining the prime contract and reviewing what is being flowed down — particularly notice, schedule and dispute provisions.
  • Scope gaps and overlaps. The prime contract assigns a scope of work to the general contractor that no subcontract covers, or that two subcontracts both appear to cover. These gaps surface mid-project as unpaid extra work.
  • Pay-if-paid versus pay-when-paid. Language conditioning payment on the general contractor’s receipt of payment from the owner shifts the risk of the owner’s nonpayment onto the subcontractor. Whether such a clause is enforceable depends on how precisely it is drafted, and it should never be accepted without deliberate negotiation.
  • Lien waivers exchanged for progress payments. Broad waivers signed with each payment application can extinguish claims the subcontractor did not intend to release, including pending change order and delay claims. Waiver forms should be negotiated at contract signing, not argued about at the twelfth payment application.
  • Dispute resolution that does not align. A subcontract that sends disputes to a different forum than the prime contract can leave a subcontractor arbitrating against the general contractor over an owner’s conduct, with the owner absent and not bound.
  • Retainage and payment timing. Where the subcontract is silent, the statutory default applies — but a subcontract can set different terms within the limits the statute permits, and the retainage terms in particular are worth negotiating.

We draft subcontract forms for general contractors and review and negotiate them for subcontractors and suppliers.

When must payment be made on a Pennsylvania commercial construction project?

The Contractor and Subcontractor Payment Act, 73 P.S. §§ 501–516, governs payment on private construction projects in Pennsylvania. It applies to commercial work and to residential projects of more than six units. It was substantially amended effective October 10, 2018, and most of its provisions cannot be waived by contract.

Requirement The rule
Owner to contractor Where the contract does not say otherwise, payment is due 20 days after the end of the billing period or 20 days after delivery of the invoice, whichever is later.
Contractor to subcontractor 14 days after the contractor receives payment, or 14 days after receipt of the subcontractor’s invoice, whichever is later.
Withholding for a deficiency A party withholding payment must notify the other party in writing of the good faith reason within the period stated in the contract, or within 14 days of receiving notice of the deficiency item. 73 P.S. § 511(b)(1).
Consequence of not giving notice Failing to give the written withholding notice waives the defenses to payment.
Interest and penalty Wrongfully withheld amounts carry interest of 1% per month plus a penalty of 1% per month — a combined exposure of roughly 24% per year.
Attorney fees The substantially prevailing party in a proceeding to recover payment is awarded reasonable attorney fees, notwithstanding any agreement to the contrary.
Suspension of performance A contractor or subcontractor that is not paid on time has a statutory right to suspend performance, subject to the notice the Act requires.
Waiver Unless the Act specifically permits it, the parties may not waive its provisions by contract.

Why this matters more than most parties realize. CASPA converts an ordinary collection dispute into one where the withholding party faces mandatory fee-shifting and an effective 24% annual carrying cost. On a seven-figure receivable that changes the settlement arithmetic entirely. It also means the written withholding notice is not a formality — sending it, correctly and on time, is often the difference between a defensible position and an automatic loss.

What should you do when a complex construction project starts to go wrong?

Projects rarely fail suddenly. They deteriorate — the schedule slips, change orders go unanswered, payment applications are paid short without explanation, and each party begins building a file. The parties who do well in the dispute that follows are the ones who recognized the deterioration early and acted while options were still open. The sequence that matters:

  1. Read the contract before doing anything else. Pull the contract and the subcontract and identify every notice provision that is a condition precedent, every claim deadline, and the dispute resolution clause. You cannot make good decisions without knowing what the documents require.
  2. Calendar the statutory deadlines immediately. Six months from last work for a lien claim; thirty days before that for a subcontractor’s notice of intention; fourteen days for a CASPA withholding notice. Calendar them at the first sign of trouble, not when the decision to fight has been made.
  3. Preserve the contemporaneous record. Daily reports, manpower records, correspondence, as-built schedules, photographs, RFIs and change order logs. The contemporaneous record decides delay and extra-work claims. Records created after the dispute begins carry far less weight than records created while the work was going on.
  4. Give the notices the contract requires. If the contract requires written notice of a claim within a stated period, give it — in the specified form, to the specified person, within the period. This is the most common and most avoidable way a good claim dies.
  5. Decide deliberately whether to continue performing. Whether to stop work, suspend under the statutory right, terminate, or continue under protest is a decision with consequences that cannot be reversed. A wrongful termination or an unjustified work stoppage converts a claimant into a defendant.
  6. Consider the commercial alternatives to a fight. On a distressed project the practical solutions are often commercial rather than legal: joint check agreements, negotiated funding, a takeover agreement, direct engagement of the surety, or a standstill while the parties work toward completion. Preserving rights and continuing to build are not mutually exclusive, but doing both requires deliberate structuring.
  7. Choose the leverage carefully. A lien, a CASPA demand, a claim under a payment or performance bond, and a suspension of work are different instruments with different effects on the project and on the relationships that have to survive it.

When should you file a mechanics’ lien in Pennsylvania?

A mechanics’ lien is a statutory security interest in the improved property, available to contractors, subcontractors and suppliers who furnished labor or materials and were not paid. It is created by the Mechanics’ Lien Law of 1963, 49 P.S. §§ 1101 et seq., and the statute is construed strictly — there is no equitable relief for a claimant who misses a step.

Step Deadline Authority and detail
Subcontractor’s notice of intention At least 30 days before filing 49 P.S. § 1501(b.1). Formal written notice served on the owner. A contractor in direct privity with the owner does not have to serve it. There is no cure for a defective or late notice.
File the lien claim 6 months after completion of the claimant’s work 49 P.S. § 1502(a)(1). Filed with the prothonotary of the county where the property sits. Returning to the site for punch list or trivial work does not restart the clock.
Serve the filed claim on the owner Within 1 month after filing 49 P.S. § 1502(a)(2).
File the affidavit of service Within 20 days after service 49 P.S. § 1502(a)(2). Failure to serve the notice or file the affidavit on time is a sufficient ground for striking the claim.
File the complaint to enforce Within 2 years of filing the claim Filing the lien preserves the claim. It does not collect on it, and the enforcement deadline is separate.

Whether to file is a business decision, not just a legal one. A lien is powerful because it attaches to the property and interferes with the owner’s financing, sale and draw schedule — which is precisely why filing one has consequences beyond the claim. It can trigger a default under the owner’s loan, breach a lien waiver the claimant has already signed, contradict a dispute resolution clause, or end a commercial relationship worth more than the receivable. It can also be discharged by the owner posting security, which converts the claim from one against the property to one against a bond.

The deadline, however, is not a business decision. Because the six-month period runs from completion of the work and cannot be extended, the analysis of whether to file must be finished before the deadline arrives — which in practice means starting it months earlier. We evaluate the claim, the waivers already signed, the contract’s dispute provisions and the commercial relationship together, and then file or do not file on a considered basis rather than a reflexive one.

How do you defend against a mechanics’ lien?

An owner or general contractor facing a lien claim has more defenses available than most assume, and the strongest of them are procedural. Because the statute is construed strictly, a claim that fails on notice, timing or service is struck without reaching the merits.

  • Compliance with the statutory steps. Was the claim filed within six months? Was the subcontractor’s notice of intention served at least 30 days before filing? Was the claim served within one month and the affidavit filed within 20 days? Each is a ground to strike.
  • Waivers already given. A properly drafted and executed waiver may bar the claim entirely. The scope and timing of the waiver, and who signed it, all matter.
  • Standing and lienability. Not every party who worked on a project has lien rights, and not everything furnished is lienable. Materials not incorporated into the improvement and certain categories of work fall outside the statute.
  • Amount and specificity. The claim may overstate the amount, include non-lienable items, or fail to identify the property or the work with the specificity the statute requires.
  • Discharge by posting security. An owner or contractor may post security to discharge the lien and free the property, moving the fight to the bond so that financing, sale or completion can proceed.

We prosecute lien claims and defend against them, and we advise owners on preventing them — through joint check arrangements, waiver protocols and payment verification down the contracting chain.

How does public construction bidding work in Pennsylvania, and what makes a bidder qualified?

Public contracts above a statutory threshold must be competitively bid and awarded to the lowest responsible bidder. Those threshold amounts are adjusted annually for inflation and published by the Department of Community and Economic Development, so the figure that governed last year’s project may not govern this one. Contracts for the Commonwealth and its agencies run under the Commonwealth Procurement Code, 62 Pa.C.S. §§ 101 et seq.; counties, municipalities, school districts and authorities run under their own governing codes.

“Lowest responsible bidder” contains two separate tests, and losing bidders routinely confuse them. Responsiveness asks whether the bid itself conformed to the invitation — whether it was on time, properly signed, accompanied by the required bid security, and free of qualifications or exceptions the invitation did not permit. Responsibility asks whether the bidder is capable of performing — its experience, financial capacity, bonding capacity, equipment, personnel and performance history. A bid can be perfectly responsive and still be rejected for want of responsibility, and a low bidder can be passed over on either ground.

The practical consequences follow from that distinction:

  • Prequalification. Many public owners require prospective bidders to be prequalified before bidding, and PennDOT maintains its own prequalification system for highway and bridge work. Losing prequalification, or holding a rating too low for the project, removes a contractor from the market before a single bid is prepared.
  • Non-responsive bids and waivable irregularities. Minor informalities can sometimes be waived by the owner; material deviations cannot, because waiving them would give the bidder an advantage other bidders did not have. Whether a defect is material is the question that decides most bid disputes.
  • Bid protests and challenges to award. A bidder rejected as non-responsible is generally entitled to notice of the grounds and an opportunity to respond, because the determination carries a stigma affecting future work. Protests move quickly and the record is usually made administratively before any court sees it — which means the response has to be right the first time.
  • Withdrawing a mistaken bid. Pennsylvania’s Public Works Contract Bid Withdrawal Law permits a bidder to withdraw a bid affected by a clerical or computational error, on strict conditions and a very short deadline after bid opening. A contractor that discovers a serious bid mistake should call counsel the same day.
  • The Separations Act. On many public building projects Pennsylvania’s Separations Act requires the owner to award separate prime contracts for plumbing, heating, ventilating and electrical work rather than a single general contract. It changes who coordinates the trades, and it is a recurring source of delay and interference claims because no one party holds the schedule.

We prepare and review bid documents, advise on responsiveness before a bid is submitted, pursue and defend protests, and handle prequalification disputes.

What bonds does a commercial construction project require?

Surety bonds are not insurance. Insurance spreads a risk the insurer expects to pay; a surety expects to be reimbursed by the contractor if it pays a claim, and it underwrites the contractor’s balance sheet accordingly. That is why bonding capacity is a credit question, and why a contractor’s ability to grow is often limited by its surety rather than by the market.

Bond What it does and when it is required
Bid bond Guarantees that if the bidder is awarded the contract it will enter into it and furnish the required performance and payment bonds. If the bidder walks away, the owner recovers the difference between that bid and the next one, up to the penal sum. Standard on public bidding and common on large private work; typically a stated percentage of the bid amount.
Performance bond Guarantees completion in accordance with the contract. On default the surety may complete with a replacement contractor, tender a completion contractor, finance the original contractor, or pay the owner’s damages — the choice is generally the surety’s, not the owner’s.
Payment bond Guarantees payment to subcontractors, laborers and suppliers. On public projects, where no mechanics’ lien can attach, this is the principal payment remedy for everyone below the prime.
Maintenance or warranty bond Secures correction of defects for a stated period after completion. Pennsylvania also permits a contractor or subcontractor to post a maintenance bond in exchange for early release of retainage.
Subdivision and land development bonds Financial security posted with the municipality for required public improvements under a land development agreement — a development obligation rather than a construction contract obligation, but frequently confused with one.
Statutory public bonds For Commonwealth agency contracts, the Procurement Code requires performance and payment bonds at 100% of the contract price on contracts above the statutory amount. 62 Pa.C.S. § 903. Local government projects fall under the Public Works Contractors’ Bond Law of 1967, 8 P.S. §§ 191–202, with its own threshold.

The indemnity agreement is the document that actually matters to a contractor. Before it issues anything, the surety requires a general agreement of indemnity, and those agreements are drafted entirely for the surety. They typically bind the company, its affiliates and its owners personally, permit the surety to settle claims at its discretion and charge the settlement back, and grant rights over contract funds and company assets on a declared default. It is signed once, early, when bonding capacity is urgently needed — and it governs every bonded job thereafter. It should be reviewed and negotiated before signature, not read for the first time after a claim.

How do you make and collect on a bond claim?

A bond claim runs on its own deadlines, entirely separate from the lien and CASPA deadlines set out above. On a public project it is usually the only payment remedy available, because a mechanics’ lien cannot attach to public property.

Step Deadline Authority and detail
Confirm the bond exists Before starting work Request a copy of the payment bond, and record the surety, bond number and penal sum. On a public project this information is generally obtainable from the contracting body.
Notice to the prime contractor Within 90 days of last furnishing 8 P.S. §§ 191–202. Required of a claimant who did not contract directly with the prime. Sound practice is to copy the surety and the contracting body even though the statute requires notice only to the prime.
Wait before suing 90 days after last furnishing Suit cannot be commenced before the 90-day period runs. The Pennsylvania Supreme Court has held that this statutory bar tolls the limitation period during that time.
File suit on the bond Within 1 year Measured from last furnishing of labor or materials.
Private project bonds Per the bond’s own terms A payment bond on a private project is a contract, not a statutory instrument. Its notice and suit deadlines come from the bond form itself and are frequently shorter than the statutory ones. Read the bond.

Collecting is a separate exercise from claiming. A surety will investigate before it pays, and the claim that gets paid is the one supported by the contract or purchase order, signed delivery tickets or daily reports, approved payment applications, a clean accounting of what was paid and what remains, and precise last-furnishing dates. Claims fail on documentation far more often than on entitlement. We prepare and prosecute bond claims, and we defend prime contractors and sureties against them.

Do you need a license to perform commercial construction in Pennsylvania?

Pennsylvania does not issue a statewide general contractor’s license for commercial construction. That surprises people who have worked in neighboring states, and it leads to a costly misunderstanding: contractors assume that because there is no state license, there is nothing to comply with. The obligations are real; they simply come from several different places at once.

  • Registration for residential work. The Home Improvement Consumer Protection Act requires registration with the Attorney General for home improvement work on private residences. It is registration rather than licensure, and it is residential — but a commercial contractor that takes on residential work steps into a regime with its own contract-content requirements and penalties.
  • Municipal trade licensing. Electrical, plumbing and mechanical trades are licensed at the municipal level in Pennsylvania, not by the state, so a contractor working across several municipalities may need several licenses and registrations. This must be checked municipality by municipality before bidding.
  • Design professional licensure. Architects, engineers and surveyors are licensed by the Commonwealth. A design-build contractor must ensure design services are performed by properly licensed professionals, and an unlicensed practice problem can put payment for the design work at risk.
  • Specialty certifications. Asbestos and lead abatement, demolition, blasting, crane operation and certain excavation work carry their own certification requirements, generally administered by the Department of Labor and Industry or the Department of Environmental Protection.
  • Public project qualification. Public owners generally require prequalification, and the Commonwealth maintains a contractor responsibility process under which tax delinquency, labor law violations or performance history can bar an award.
  • Worker classification. Contractors that treat workers as independent contractors face specific exposure under Pennsylvania’s construction workplace misclassification statute, which carries penalties beyond the ordinary tax and wage consequences.
  • Foreign entity registration. An out-of-state company must register to do business with the Department of State before it can maintain suit in Pennsylvania — a defect usually discovered at the worst moment, when the company is trying to enforce a claim.

How do you comply with the Uniform Construction Code and local requirements?

Pennsylvania construction is governed by the Uniform Construction Code, adopted under the Pennsylvania Construction Code Act, Act 45 of 1999, 35 P.S. §§ 7210.101 et seq., with implementing regulations in the Pennsylvania Code. The UCC adopts national model codes and applies statewide, which produces a uniform substantive standard — but enforcement is anything but uniform.

Each municipality elects whether to administer and enforce the UCC itself, through a third-party agency, or by leaving enforcement to the Department of Labor and Industry. The result is that the same building is reviewed by different people applying the same code with materially different practices, and a contractor working across a county can encounter three different plan review timelines and three different inspection regimes on comparable buildings.

  • Local amendments have limits. Municipalities may adopt amendments to the UCC, but only through the procedures the statute prescribes. An amendment adopted without following them is vulnerable — which matters when a local requirement is imposing real cost on a project.
  • State-level review. Certain buildings require plan review and approval at the state level in addition to local permitting, and missing that step late in design is expensive.
  • Appeals and alternatives. A code official’s decision on plan review, inspection or a certificate of occupancy can be appealed to the local board of appeals, and from there to court. There is also a process for approving alternative materials and methods that do not fit the prescriptive code. Both are underused.
  • Beyond the building code. A commercial project sits under obligations the building code does not cover — accessibility, stormwater and erosion control permitting through the Department of Environmental Protection and the county conservation district, highway occupancy permits from PennDOT, fire and life safety, and utility approvals. Sequencing these against the construction schedule is a project management problem with legal consequences.

We handle code disputes, appeals of code official determinations, stop work orders, certificate of occupancy refusals, and the permitting sequence on development projects.

Can permit, connection and impact fees be negotiated or challenged?

Some can and some cannot, and knowing the difference is worth real money on a large project. Building permit fees themselves are set by ordinance and are rarely negotiable. The substantial charges — sewer and water connection fees, impact fees, review escrows and the improvements a municipality demands as a condition of approval — are a different matter. They are constrained by statute, calculated by consultants, and frequently wrong.

  • Sewer and water tapping fees. Tapping fees charged by a municipal authority must be calculated in accordance with the Municipality Authorities Act, 53 Pa.C.S. § 5607(d)(24), which enumerates the components that may be charged and how each must be computed. The statute also gives a party required to pay a tapping fee a specific right: it may submit a professional engineer’s opinion challenging the design capacity calculation, and the authority must then obtain within 30 days an independent engineer’s written certification that the calculation was properly performed. If the authority does not obtain that certification within 30 days, it may not impose or collect tapping fees based on the challenged calculations until it does. The same provision requires the authority to make the data underlying its capacity determination available to the public on request.
  • Reimbursement for developer-installed infrastructure. Where a developer builds infrastructure at its own cost that the authority then takes over, the reimbursement component of the fee structure may entitle the developer to recover from later connections. Pennsylvania appellate courts have continued to work through what an authority may charge and retain — and excess tapping fees have been treated as owing back to the developer.
  • Transportation impact fees. A municipality may impose transportation impact fees only after adopting the statutory framework the Municipalities Planning Code requires, including the required studies and ordinance. A fee imposed outside that framework, or calculated on assumptions the study does not support, is open to challenge.
  • Review escrows and consultant fees. Municipalities routinely require applicants to fund engineering and legal review through an escrow. The MPC limits what may be charged and provides a dispute procedure when an applicant contests the reasonableness of a professional’s bill. Applicants pay these invoices without review far more often than they should.
  • Improvements demanded as conditions of approval. The road improvements, signalization, buffering and dedications a municipality asks for as a condition of land development approval are negotiated, not fixed. They belong in the land development agreement and are frequently the largest single cost in the approval process.
  • The practical point. These charges arrive as invoices with an official appearance, and most applicants treat them as fixed. They are calculations, produced by consultants, resting on assumptions, and governed by statutes that say what may and may not be included. On a project of any scale the review pays for itself.

What is the State Construction Notices Directory and does it apply to my project?

Pennsylvania maintains an online State Construction Notices Directory for larger private projects. Where a project’s costs exceed $1,500,000 and the owner elects to file a Notice of Commencement in the Directory, the project becomes a “searchable project,” and subcontractors and suppliers must file a Notice of Furnishing in the Directory — generally within 45 days after first furnishing labor or materials — in order to preserve lien rights.

This creates a trap in both directions. A subcontractor on a large project that does not check the Directory can lose its lien rights before it has any reason to think there is a payment problem. An owner that files a Notice of Commencement gains real protection, but only if the filing and posting requirements are followed exactly.

Because the threshold is tied to project cost, the Directory is directly relevant to exactly the projects this practice handles. Checking it should be a standing item at the start of any commercial project, for every party on it.

Should a construction dispute go to mediation, arbitration or litigation?

The answer is usually decided years before the dispute, by the dispute resolution clause in the contract. That is the strongest argument for negotiating it deliberately rather than accepting the form language. Each route behaves differently:

Route Where it fits What to weigh
Mediation Almost every construction dispute, and usually early. A neutral with construction experience can resolve a claim while the project is still being built and the relationships still matter. Non-binding, so it depends on both sides being ready. Often required as a condition precedent by the contract. Cheap relative to what follows, and worth attempting even where it seems unlikely to succeed.
Arbitration Technically complex disputes where a construction-experienced arbitrator is worth more than a jury, and where privacy matters. Judicial review of an arbitration award in Pennsylvania is extremely limited, and under a common law arbitration agreement it is narrower still. That finality is an advantage if you win and close to unappealable if you do not — which is why the type of arbitration the clause specifies deserves attention at drafting.
Litigation Multi-party disputes needing joinder of owner, contractor, subcontractors, sureties and design professionals; lien enforcement; and cases where an appellate route matters. Public, slower and more expensive, but it offers full discovery, the ability to bring in every responsible party, and meaningful appellate review.

Two practical points. First, a mechanics’ lien enforcement action proceeds in the Court of Common Pleas regardless of an arbitration clause governing the underlying contract, so a project can generate parallel proceedings unless the clause is drafted to address it. Second, aligning the prime contract and the subcontracts on the same forum is what makes it possible to resolve a multi-tier dispute in one proceeding instead of three.

What other commercial construction disputes does the firm handle?

  • Delay and disruption claims. Establishing entitlement and quantum for delay, disruption and acceleration, including schedule analysis and the contemporaneous record required to support it.
  • Change order and extra work disputes. Directed changes, constructive changes, and work performed on the promise of a change order that never issued.
  • Differing site conditions. Subsurface and concealed conditions that differ materially from the contract documents.
  • Construction defect claims. Design flaws, workmanship failures and material failures — prosecuting and defending, including the coordination of expert evidence.
  • Bond claims. Claims against payment and performance bonds, and coordination with sureties on distressed projects.
  • Termination disputes. Terminations for cause and for convenience, and the wrongful termination claims that follow them.
  • Insurance and indemnity disputes. Coverage analysis, additional insured tenders and the interaction between indemnity obligations and the policies meant to fund them.

How do public projects differ from private commercial projects?

The differences are structural, not cosmetic, and applying private-project assumptions to a public job is one of the most expensive mistakes a contractor can make. The comparison in short:

Issue Private commercial project Public project
Payment security Mechanics’ lien against the improved property, plus any bond the contract requires. No lien may attach to public property. The statutory payment bond is the principal remedy.
Award of the work Negotiated or privately bid on whatever terms the owner chooses. Competitive bidding above the statutory threshold, awarded to the lowest responsible bidder, subject to protest.
Bonding Required only if the contract requires it — negotiable. Performance and payment bonds required by statute above the threshold, generally at 100% of the contract price.
Prompt payment CASPA, 73 P.S. §§ 501–516, with 1% interest, a 1% penalty and mandatory fee-shifting. A separate statutory prompt payment scheme applies; CASPA does not govern.
Trade contracting The owner may use a single general contract. The Separations Act requires separate prime contracts for certain trades on many public building projects.
Qualification Whatever the owner requires. Prequalification and contractor responsibility requirements can bar an award outright.

If your project is publicly owned or publicly funded, say so at the outset. It changes the deadlines, the remedy and the strategy.

Why choose Hoegen & Associates, P.C. for a commercial construction matter?

  • We work both ends of the project. We draft and negotiate the contracts and subcontracts, and we try the disputes that arise under them. Each informs the other: we draft knowing how clauses are argued, and we litigate knowing how they were negotiated.
  • We represent every position on a project. Owners and developers, general contractors, subcontractors and suppliers. Having represented each, we can tell a client early and candidly how the other side is likely to see the dispute.
  • Construction is part of a broader development practice. Construction sits alongside our land development, zoning and commercial real estate work. On a development project, the entitlement, the construction contract and the financing are one problem, not three.
  • We cover the project from bid to final payment. Qualification and bidding, bonding and the surety indemnity behind it, licensing, permits and code compliance, the contract, the build, and the dispute. Most of these are handled by different advisors at different times, which is how gaps appear.
  • We treat municipal fees as reviewable. Permit, tapping, impact and review fees arrive looking fixed. They are calculations governed by statute, and on a large project the review pays for itself.
  • We treat the statutory deadlines as the first priority. The deadlines on this page are not negotiable, and most claims that fail, fail on one of them. Our first act on a distressed project is to calendar every one.

Frequently Asked Questions

How long do I have to file a mechanics’ lien in Pennsylvania?

Six months after completion of your work. 49 P.S. § 1502(a)(1). Written notice of the filing must then be served on the owner within one month, and an affidavit of service filed within twenty days after service. Missing any of these is a ground for striking the claim, and returning to the site for punch list work does not extend the six months.

Does a subcontractor have to give notice before filing a lien?

Yes. A subcontractor must serve formal written notice of its intention to file at least thirty days before filing the claim. 49 P.S. § 1501(b.1). A contractor in direct privity with the owner is not required to serve that notice. There is no cure period if the notice is late or defective — the lien right is simply lost.

How much interest can I recover on a wrongfully withheld construction payment?

Under CASPA, wrongfully withheld amounts carry interest of one percent per month plus a penalty of one percent per month, and the substantially prevailing party is awarded reasonable attorney fees notwithstanding any agreement to the contrary. 73 P.S. §§ 501–516.

Can my contract require me to give up these rights?

Largely, no. CASPA provides that unless the Act specifically authorizes it, the parties may not waive its provisions by contract. A clause that conflicts with the statute generally gives way to the statute. Mechanics’ lien rights are treated differently and can be affected by waivers, which is why waiver language should be negotiated at contract signing.

How do you make a payment bond claim on a Pennsylvania public project?

Under the Public Works Contractors’ Bond Law of 1967, 8 P.S. §§ 191–202, a claimant who did not contract directly with the prime contractor must give the prime written notice of the claim within ninety days after last furnishing labor or materials. Suit cannot be commenced until ninety days after that last furnishing, and must be brought within one year of it. Because no mechanics’ lien can attach to public property, the payment bond is the principal remedy.

Do you need a contractor license to perform commercial construction in Pennsylvania?

Pennsylvania does not issue a statewide general contractor license for commercial work. Obligations come instead from registration requirements for residential home improvement work, municipal licensing of trades such as electrical and plumbing, state licensure of design professionals, specialty certifications, and prequalification on public projects. The absence of a state license is not the absence of compliance obligations.

Are sewer and water tapping fees negotiable?

They are calculated, and calculations can be wrong. Tapping fees must be computed in accordance with the Municipality Authorities Act, 53 Pa.C.S. § 5607(d)(24), which enumerates what may be charged. A party required to pay one may submit a professional engineer’s opinion challenging the design capacity calculation, and the authority must obtain an independent engineer’s certification within thirty days or lose the ability to collect on the challenged basis until it does.

Should I file a lien or just sue for breach of contract?

Often both, and they are not alternatives. A lien secures the claim against the property but must be filed within six months and enforced within two years. A contract action, or a CASPA claim with its interest, penalty and fee-shifting, pursues the party who owes the money. Which combination fits depends on the contract’s dispute resolution clause, any waivers already signed, and the commercial relationship.

Talk to a Pennsylvania commercial construction attorney

If a payment application has gone unpaid, a schedule has slipped, a change order has been refused, or you are being asked to sign a contract or subcontract you have not had reviewed, the earlier the conversation the more options remain. Call Hoegen & Associates, P.C. at 570-820-3332 — 152 S Franklin St, Wilkes-Barre, PA 18701.

This page provides general information about Pennsylvania construction law and is not legal advice. Statutory deadlines are strict and fact-dependent, and the requirements applicable to a specific project should be confirmed with counsel.

Helping Your Business Thrive

Contact our office today to schedule a free initial consultation.

Schedule Your Free Consultation Today!

Request a meeting with one of our esteemed attorneys to review your case and learn what your legal options are.

At Hoegen & Associates, P.C., our attorneys have years of experience serving businesses throughout Wilkes-Barre, PA and across the country. Our areas of practice include commercial, construction, and real estate law. Learn how we can support your goals, assist with dispute resolution, and protect your business’s bottom line.